Customer Scenario: Furnishing 80 Guest Rooms with Bedroom Furniture from Istanbul
A representative walk-through of an 80-room hotel furniture order, from the first brief to installation, focusing on the decisions buyers take at each stage. It is an illustrative scenario, not a client reference.
This hotel bedroom furniture project example follows a typical 80-room order from first enquiry to handover. It is a representative scenario built from common project patterns, not a real client story, and it contains no invented figures. Its purpose is to show what you decide, what the factory decides and where projects usually gain or lose time.
The scenario in brief
Imagine a new-build, mid-to-upscale city hotel with 80 guest rooms. The owner has appointed an interior designer, a fit-out contractor manages the site, and the furniture package is bought directly from a Turkish factory in Istanbul.
The package covers fixed joinery and loose furniture for the guest rooms:
- Headboard wall panels and bed bases
- Wardrobes with interior fittings
- Desk or dressing table with chair
- Bedside tables, luggage bench and minibar cabinet
The hotel has three room types: standard twin, standard king and a small number of suites. That mix matters, because it affects how many parts can be standardised.
Stage 1: The brief and room schedule
The project starts with documents, not prices. The designer sends floor plans, room layouts, elevations, a finish board and a first room schedule listing each room type and its furniture items.
At this stage the factory reviews the package and asks questions. Typical ones include:
- Which fire-retardant requirements apply in the destination country?
- Is the headboard wall-hung or attached to the bed?
- Where are sockets, switches and lighting integrated into joinery?
- Which Incoterm does the buyer prefer: EXW, FOB, CIF or DAP?
Decision taken: the buyer chooses to standardise the wardrobe carcass across all room types and vary only the front widths. This keeps tooling and drawing work simple and makes reordering easier later.
Stage 2: Quotation and specification alignment
A usable quotation is built on a clear specification: board type and thickness, veneer or HPL, edge banding, hardware level, upholstery, packing and installation scope. If two suppliers quote against different specifications, the totals cannot be compared fairly.
In this scenario the buyer sends the same specification to every bidder and asks for packing, loading and installation to be shown as separate lines. That makes hidden costs visible early.
Decision taken: the owner accepts a commercial-grade hardware level for drawers and hinges, and saves budget on non-visible interior finishes rather than on the surfaces guests touch every day.
Stage 3: Shop drawings
After the order is confirmed, the factory prepares shop drawings that translate the designer's intent into buildable detail. They show dimensions, joints, fixing methods, hardware positions and finish references for every piece.
This is the stage where site reality enters the project. The contractor measures actual wall positions, ceiling heights and floor levels, and any deviation from the architectural drawings is flagged before cutting begins.
Expect several revision rounds. Each round is quick when comments are consolidated into a single list, and slow when they arrive piecemeal from several people.
Decision taken: the project agrees a single approver on the owner's side, so drawings are signed off once rather than debated by four parties.
Stage 4: Samples and the mock-up room
Finish samples come first: colour, sheen and grain on a physical board, judged in the lighting of the real room. Screens and renders rarely show sheen correctly.
Next comes the mock-up, which for an 80-room hotel usually means one complete room set, or at least a wardrobe section, a headboard and a desk. The operator, designer and owner review it together and record their comments in writing.
Typical adjustments at this point include:
- Handle position or finger-pull depth
- Wardrobe light switching
- Socket height at the bedside
- Luggage bench height against the bed
Decision taken: the team signs a mock-up approval sheet that lists every accepted detail. Production then follows the approved sample, not memory.
Stage 5: Production planning
With drawings and sample approved, materials are ordered and production is scheduled. Lead time depends on package size, finishes, upholstery sourcing and how quickly approvals come back, so any figure would be project-specific. What matters is that production is linked to the construction programme rather than to the order date alone.
For 80 rooms, a sensible approach is to ask whether deliveries can be split by floor or block. If the site will not be ready for all rooms at once, phased delivery reduces storage risk on site.
Decision taken: the buyer chooses two deliveries, matched to the floors the contractor expects to finish first.
Stage 6: Quality checks during production
Inspection points run from cutting to packing. Useful checks include board thickness, edge banding adhesion, veneer or laminate consistency, door alignment, drawer movement and finish colour against the approved sample.
Because 80 rooms means many identical units, consistency across batches is a key concern. Finishing materials for all units are ideally planned together, since colour can drift between separate batches.
The buyer can request photos or a video review, or send an inspector, before shipment.
Stage 7: Packing, labelling and shipping
Furniture for overseas hotels needs robust packing: corner protection, wrapping, and crating where pieces are fragile. Just as important is labelling. Every carton should carry the room type, floor or room number and item name, so installers can place pieces without opening everything.
The Incoterm determines who handles each leg of the journey. With FOB, you arrange main freight from the Turkish port. With DAP, the supplier arranges delivery to your named place, excluding import clearance.
Decision taken: the buyer picks a delivery term that matches the freight forwarding capacity they already have, instead of the one that looks simplest on paper.
Stage 8: Delivery and receiving inspection
On arrival, the contractor checks cartons against the packing list before signing, photographs any visible damage and records it the same day. Claims are far easier to resolve when evidence is dated and specific.
Furniture should wait in a dry, enclosed area until the rooms are ready. Dust, moisture and trade traffic damage joinery quickly on active construction sites.
Stage 9: Installation and snagging
Installation normally follows a set sequence: fixed joinery such as wardrobes and wall panels first, then bed bases and headboards, then loose furniture. Walls and floors are rarely perfectly level, so scribing and adjustable feet are part of normal work.
The team then walks each room with a snagging checklist covering door alignment, scratches, hardware function, gaps and cleaning. Minor touch-ups are done on site, and larger defects are documented for replacement.
Depending on the scope, installation can be done by factory installers, a local crew or the fit-out contractor. We can discuss which option suits your site and country.
What this scenario teaches
Across all stages, the pattern is the same: projects run smoothly when decisions are made early and recorded in writing.
- Prepare a complete room schedule before asking for prices.
- Standardise parts across room types wherever the design allows.
- Approve a mock-up and keep a signed record of it.
- Match deliveries to site readiness, not just to the factory schedule.
- Agree inspection and claim procedures before shipment.
Next step
If you are planning a similar project, send us your drawings or room schedule. We supply hotels worldwide from our Istanbul factory and will respond with material suggestions, an estimated timeline for your programme and shipping options for your destination.
Sıkça Sorulan Sorular
Is this a real client case study?
No. It is a representative scenario built from common project patterns for an 80-room hotel. It contains no client names, prices or delivery times, because those depend on each project. Its purpose is to show the stages and decisions you can expect when ordering from an Istanbul factory.
What documents do I need to start an 80-room furniture enquiry?
Send floor plans, room layouts, elevations, a room schedule listing items per room type, and any finish references. If you have the designer's concept or material board, include it. The more complete the package, the more accurate and comparable the first quotation will be.
Should I approve a mock-up room for 80 rooms?
Yes, it is strongly advisable. A mock-up lets the owner, designer and operator check proportions, finishes and details before production. Changes at this stage are inexpensive, while the same changes after production begins affect cost and schedule significantly.
Can deliveries be split into batches?
Often yes. Phased delivery by floor or block suits sites where rooms are completed at different times and reduces storage risk. The practical options depend on production planning and your construction programme, so raise it early when discussing the schedule.
Do you ship to every country?
We sell and ship worldwide from our Istanbul factory. Routes, Incoterms, documents and installation arrangements vary by destination, so tell us your site location and preferred terms such as FOB, CIF or DAP, and we will outline the options.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.