Ordering Custom Bedroom Furniture from an Istanbul Factory: Sample, Drawings and Worldwide Delivery
A practical walkthrough of how an overseas hotel project moves from brief to delivery when you order custom bedroom furniture from Istanbul. Learn what to send, what to approve and how shipping is organised.
If you plan to order custom bedroom furniture in Istanbul for a hotel, residence or serviced apartment project abroad, the process is more straightforward than many first-time buyers expect. It follows a clear sequence: brief, shop drawings, sample or mock-up, production, packing and delivery. This guide walks you through each step so you know what to prepare and what to expect from a Turkish furniture manufacturer.
Why buyers look to Istanbul for bedroom furniture
Istanbul is a major centre for hospitality joinery, with factories that combine woodworking, veneering, lacquering, upholstery and metal detailing under one roof. For international buyers, the city also offers short sea and road routes to Europe, the Middle East, Central Asia and Africa.
At Palmiye, we produce to your project drawings in our own factory in Istanbul. That means the pieces are made for your rooms, not pulled from a catalogue. Whether you need a hotel furniture supplier in Turkey for 30 rooms or several hundred, the working method is the same.
Step 1: Send a clear brief
A good brief saves weeks later. You do not need a finished design package to begin, but the more you share, the more accurate our first response will be.
- Room schedule: number of each room type and the furniture items in each.
- Drawings or sketches: floor plans, elevations, interior design boards or reference photos.
- Material and finish intent: veneer, HPL, lacquer, upholstery, hardware preferences.
- Destination country: this affects fire requirements, packing and shipping terms.
- Target dates: your opening date or the date rooms become ready for installation.
If you have not yet decided on every detail, say so. We can suggest options and point out where standardising parts across room types may reduce cost.
Step 2: Review the first technical response
After reviewing your brief, we respond with questions, material suggestions and an indicative quotation. Price depends on dimensions, materials, finishes, hardware, quantity, packing and the delivery terms you choose, so we avoid quoting before the scope is clear.
Ask for the quotation to state what it includes. In particular, check whether it covers:
- Export packing and loading
- Spare parts or extra stock
- On-site installation, if you need it
- The Incoterm used, such as EXW, FOB, CIF or DAP
Step 3: Shop drawings
Once the scope is agreed, our technical team prepares shop drawings. These translate the design intent into production detail: exact dimensions, board thicknesses, edge treatments, hardware positions, finish references and fixing methods.
This is the most important approval point in the whole project. Check the drawings against the architectural plans, the electrical layout and the mattress and bedding sizes. Socket positions, light switches and wall irregularities are common sources of late changes.
What to check on a drawing
- Overall sizes against the surveyed room dimensions
- Clearances for doors, drawers and bed access
- Finish and veneer references, including grain direction
- Hardware type and soft-close requirements
- Cut-outs for power, data and lighting
Revisions are normal at this stage. Changes made on paper are far cheaper than changes made after cutting has started.
Step 4: Sample or mock-up room
For anything beyond a very small order, we recommend approving a physical sample or a full mock-up room. A sample shows the real colour, sheen, edge quality and hardware feel, which renders cannot fully convey.
A mock-up room usually includes the bed or headboard, bedside tables, wardrobe, desk and any seating, assembled in one place. Designers, owners and operators can then review proportions and details together. Record every comment in writing and have the approved version signed off, so it becomes the reference standard for production.
Overseas buyers can review the sample in person at our Istanbul factory, by video call, or by having the sample shipped. A video walkthrough is useful for general checks, but colour is best judged on a physical board.
Step 5: Production
After sample approval, we confirm the production schedule. Lead time depends on quantity, material availability, finishing complexity and how quickly approvals are given, so we agree it with you per project rather than quoting a fixed number.
During production, the main stages are:
- Material preparation and cutting
- Edge banding, veneering or laminating
- Finishing, such as lacquer or oil, and curing
- Upholstery for headboards, benches and seating
- Assembly checks and quality inspection
If you have multiple floors or phased openings, tell us early. Production can often be split into batches that match your site readiness.
Step 6: Packing and labelling
Export packing protects the furniture through factory, port, vessel and site handling. Pieces are wrapped, corners are protected and cartons or crates are labelled so that each item can be traced to its room.
Room-by-room labelling is especially valuable on hotel projects. It lets the installation team unload and distribute furniture floor by floor without opening every package. A packing list and photographs of the loaded shipment help you check the delivery against the order.
Step 7: Worldwide delivery
We supply buyers worldwide and organise export shipments to suit the destination. Choose the delivery term that matches how much of the logistics you want to handle:
| Term | What it generally means for you |
|---|---|
| EXW | You collect from the factory and manage export clearance and freight. |
| FOB | The seller delivers to the vessel at the Turkish port; you arrange main freight. |
| CIF | The seller arranges sea freight and insurance to your destination port. |
| DAP | The seller arranges delivery to the named place; you handle import clearance. |
Sea freight is common for large orders, while road transport is often practical for nearby markets in Europe and the Middle East. Transit time depends on route, season and port conditions, so it is best planned against your installation programme. Ask your customs broker which documents your country requires, and let us know early so we can prepare invoices and origin documents accordingly.
Step 8: Installation and handover
Installation is where good planning pays off. Furniture should arrive when rooms are clean, dry and finished, with floors protected. Depending on the project, installation can be carried out by our team, by your contractor or by a local crew following our drawings and instructions.
At handover, inspect each room against the approved sample, note any defects in writing and agree on a snagging list. Keeping a small stock of spare parts is also a sensible precaution for future maintenance.
Practical tips for a smooth first order
- Send a surveyed room schedule, not only design renders.
- Nominate one decision-maker for approvals to avoid conflicting comments.
- Approve finishes on physical samples, not on screens.
- Align the production and shipping schedule with your construction programme.
- Agree the Incoterm, payment schedule and packing standard before production begins.
Next step
If you are planning a new hotel, residence or renovation and want to order furniture from Turkey, send us your drawings, room schedule or even early sketches. We will review the scope and come back with material suggestions, an estimated lead time and shipping options for your destination.
Sıkça Sorulan Sorular
Can I order custom bedroom furniture from Istanbul if I only have sketches?
Yes. Sketches, reference photos and a room schedule are enough to start a conversation. We will ask clarifying questions, suggest materials and prepare an indicative quotation. Detailed shop drawings are developed after the scope is agreed and before production begins.
Do I need to visit the factory before ordering?
A visit is welcome but not required. Many overseas buyers review progress by video call, approve physical samples shipped to them and rely on photo reports. Whichever route you choose, written sign-off on drawings and the sample is essential.
Do you deliver furniture to any country?
We supply buyers worldwide. The best route depends on your destination, volume and schedule. Sea freight, road transport or a combination can be arranged, and we can quote under terms such as EXW, FOB, CIF or DAP depending on your preference.
How long does it take to receive custom bedroom furniture from Turkey?
It depends on quantity, materials, finishes, approval speed and shipping route. We do not give a fixed figure without project details. Send your drawings and target dates, and we will estimate a realistic schedule from approval to delivery.
Can Palmiye install the furniture abroad?
On-site installation can be discussed as part of the project scope. Depending on location and requirements, installation may be done by our team, your contractor or a local crew guided by our drawings and room-by-room labelling.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.